国产精品一区二区在线观看-国产精品一区二区三区免费视频-国产精品一区二区三区高清在线-国产精品一区二区三-欧美一级棒-欧美一级xxxx俄罗斯一级

Time: 2024-08-18  szwkw

One minute understanding of current transformers

A current transformer is an instrument that converts high primary current into low secondary current based on the principle of electromagnetic induction for measurement. A current transformer is composed of a closed iron core and winding. Its primary winding has very few turns and is connected in series in the circuit where the current needs to be measured. The principle of current transformer is based on the principle of electromagnetic induction. A current transformer is composed of a closed iron core and winding. Its primary winding has very few turns and is connected in series with the line that needs to measure the current, so it often has all the current flowing through the line. The secondary winding has a relatively large number of turns and is connected in series with the measuring instrument and protection circuit. When the current transformer is working, its secondary circuit is always closed, so the impedance of the measuring instrument and protection circuit series coil is very small, and the working state of the current transformer is close to a short circuit.


The M8 type current transformer from Shenzhen Weikewei Technology Company has a small primary current and is commonly used in relay protection circuits. It is suitable for small spaces such as low-voltage drawer cabinets. Used for collecting low-voltage overload and short circuit signals, and used in conjunction with protective relays and motor protectors.


1、 Function of current transformer


The main function is to convert high currents in AC circuits into small currents with a certain ratio of 62616964757a686964616Fe78988e69d8331333366303839 (China's standard is 5 amperes) for measurement and relay protection purposes only. In the process of power generation, transformation, transmission, and distribution, due to the different electrical equipment used, the current often ranges from tens of amperes to tens of thousands of amperes, and these circuits may also be accompanied by high voltage.


So in order to monitor and measure the circuits of these lines, while also addressing the dangers posed by high voltage and high current, current transformers are needed. The clamp meter used by electricians is a device used to measure alternating current, and its "clamp" is a through type current transformer.


電流互感器原理


2、 Working principle of current transformer


The principle of a current transformer is based on the principle of electromagnetic induction. Its primary winding often has all the current of the line flowing through it. When the current transformer is working, its secondary circuit is always closed. Therefore, the impedance of the measuring instrument and the protection circuit connected in series with the coil is very small, and the working state of the current transformer is close to a short circuit.


In an ideal current transformer, if it is assumed that the no-load current I0=0, the total magnetic potential I0N0=0. According to the law of conservation of energy, the magnetic potential of the primary winding is equal to that of the secondary winding, that is, I1NI=- I2N2


The current of a current transformer is inversely proportional to its number of turns, and the ratio of primary current to secondary current I1/I2 is called the current ratio of the current transformer. When the secondary current is known, the primary current can be calculated by multiplying it by the current ratio. At this point, the phasor of the secondary current differs from that of the primary current by 1800.


3、 Principles for the use of current transformers


1. In order to meet the needs of measuring instruments, relay protection, circuit breaker failure judgment, and fault filtering devices, 2-8 secondary winding current transformers are installed in circuits such as generators, transformers, outgoing lines, bus section circuit breakers, bus circuit breakers, and bypass circuit breakers.


2. The installation location of protective current transformers should be set to eliminate the unprotected area of the main protection device as much as possible. For example, if there are two sets of current transformers and their positions allow, they should be placed on both sides of the circuit breaker, so that the circuit breaker is within the cross protection range


3. In order to prevent busbar faults caused by bushing flashover of pillar type current transformers, current transformers are usually arranged on the outgoing line or transformer side of circuit breakers


4. In order to reduce the damage caused by internal faults in the generator, the current transformer used for automatic adjustment of the excitation device should be arranged on the outgoing side of the generator stator winding. In order to facilitate analysis and detect internal faults before the generator is integrated into the system, the current transformer used for measuring instruments should be installed on the neutral point side of the generator.


Through the above introduction to the function, working principle, and usage principle of current transformers, I would like to give you a better understanding of current transformers. If you have any further questions about current transformers, please contact Weikewei Technology directly.

主站蜘蛛池模板: 爱我久久视频网片| 国产精品国产国产aⅴ| 91系列在线观看| 免费黄色网站视频| 99热这里都是精品| 亚洲精品免费在线视频| 青青草视频在线免费观看| 99久久精品免费看国产| 亚洲一区美女| 在线观看亚洲免费| 亚洲网址在线观看| 中文字幕乱偷乱码亚洲| 成+人+黄+色+免费观看| 久久精品免费视频6| 免费 视频 1级| 亚洲人成影院在线高清| 全城热恋官网最新一期| 久久久久久久99久久久毒国产| 四虎免费久久影院| 中文字幕精品在线视频| 成人影院久久久久久影院| 免费在线观看www| 99热在线观看精品| 99久久综合狠狠综合久久aⅴ| 国产欧美精品一区二区| 久久久久久久久综合影视网 | 99精品高清不卡在线观看| 亚洲欧美精品一区二区| 国产成人精品免费视频网页大全| 日日干夜夜爱| 欧美亚洲综合一区| 日本在线视频精品| a毛片在线| a毛片在线| 99视频国产热精品视频| 成人免费一级在线播放| 亚洲最大激情中文字幕| 日韩高清在线不卡| 国产一区2区| 美女被黄网站免费视频| 欧美久久久久久|