国产精品一区二区在线观看-国产精品一区二区三区免费视频-国产精品一区二区三区高清在线-国产精品一区二区三-欧美一级棒-欧美一级xxxx俄罗斯一级

Time: 2024-08-18  韋克威科技

Research on DC270V Arc in the United States - Non Arc Distribution SSPC - [Wickway]

In organizing the research on the DC270V arc in the international aviation system, the editor found that at the most recent semi annual meeting submitted to SAE, some companies and the Federal Aviation Administration (FAA) did work last summer, such as in countries where high-voltage direct current was used earlier, such asResearch on DC270V Arc in the United StatesWill it be earlier. The editor found that these tests were conducted at the Federal Aviation Administration's technology center in Atlantic City, with a test voltage of 270VDC. Although DC270V can significantly improve the weight of the entire machine, it is also very difficult to handle the DC 270V arc. This research has given rise toArc free distribution SSPCDevelopment and growth.

美國對(duì)DC270V電弧的研究

This 270V arc test has four objectives:

1. Conduct tests that help groups such as SAE better understand the potential damage caused by higher voltage arc events;

2. Determine the impact of 270VDC direct contact arc on several target types;

3. Determine the 270VDC impact caused by indirect arc damage; as well as

3. Collect 270VDC arc waveform data for the arc damage modeling tool (ADMT) of various user units.

The testing configuration and method used are similar to the commonly reported arc damage techniques, although some modifications have been made to the 270VDC power supply. In a general testing configuration, the power supply runs to the arc fault position through a contactor. Adjustable fault current limiting resistors are placed on the circuit, and fuses are also placed on the circuit to limit the duration of the arc.

無弧配電sspc

In the experiments conducted by the FAA and various research institutions over the past decade, it has been found that the swing test is a good representative test procedure for evaluating direct contact arc damage. In these swing tests, a cut is made on the insulation layer of the wire to expose the wire to the outside. Then connect both ends of the wire to the circuit and to the power supply. In this example, the target is a part of the aircraft structure that is connected to the ground. At the beginning of the test, unplug the wire from the target, apply power, and then release the wire to freely swing into the structure, forming contact and generating an arc.

韋克威


tag: SSPC
主站蜘蛛池模板: 欧美精品成人久久网站| 亚洲依依成人精品| 超91在线| 九九热视频在线观看| 99久久国产| 青春草久久| 亚洲国产成人久久综合碰碰动漫3d | 91视频国产精品| www.四虎| 久久99亚洲综合精品首页| 欧美最新一区二区三区四区| 亚洲精品亚洲人成在线| 4399影视在线观看免费高清| 福利在线看片| 免费在线看黄视频| 日韩久久一级毛片| 青青草视频黄色| 欧美亚洲国产一区二区| 特级黄色免费片| 99久久综合狠狠综合久久| 久久成人亚洲香蕉草草| 亚洲视频一区| 久久久久久久99久久久毒国产| 国产在视频| 国产91在线 | 亚洲| 成年人黄色在线观看| 日韩中文字幕精品| 国产亚洲一区在线| 嫩草影院免费看| 亚洲一区欧美日韩| 国产精品综合视频| 欧美亚洲日本一区| 黑鸭影院| 777色网| 靠比在线观看| 2021国产成人综合亚洲精品| 黄a大片| 97久久精品国产精品青草| 欧美久在线观看在线观看| 亚洲 欧美 在线观看| 青青操网站|