国产精品一区二区在线观看-国产精品一区二区三区免费视频-国产精品一区二区三区高清在线-国产精品一区二区三-欧美一级棒-欧美一级xxxx俄罗斯一级

Time: 2024-08-18  韋克威科技

Selection of Aviation Circuit Breakers - Wei Ke Wei - SAE Guide 7-step Selection

Step 1: Select the type of protective device

This is when selecting one of the following types of protective equipment: thermal circuit protection, fuses, arc fault protection devices, or distributed power control units.Each fuse has its own advantages and disadvantages (for example, the fuse has a faster tripping time, but can only be used once at a time), so it is necessary to understand the specific system requirements before choosing.


NASA航空斷路器選型規范


Step 2: Determine the operating environment

For space applications designed with flowcharts, the operating environment also includes considerations of vacuum and zero gravity, as this may affect the separation distance required to disconnect the circuit.For those who have more ground applications, the operating environment remains an important consideration.If the device operates in an uncontrolled environment or is a software controlled system,Then it should be consideredExpose itUnder electromagnetic interference (EMI) or high temperature.

Step 2a: Select device level

Determine the required current for the application without any modification factors.Information from FAA AC 43.13The meaning of circuit breaker and the wire size of the wire system are provided. Please note that this rating information is based on the maximum size circuit protection of the given line gauge. This will provide a starting point for the selection of wire/circuit protection dimensions.

Step 2b: Select the adjusted device level

The adjusted equipment rating is based on the environmental factors determined in step 2.just asAs discussed in EWIS's "LECTROMEC Derating Tool Tutorial"The operating height will affect the given current carrying capacity of the wire harness.

Step 3: Determine the device level to be used

Determine which option requires the widest range of operating environment conditions based on the choice between 2a and 2b;This may be a combination of the two.

Step 4: Calculate the maximum temperature difference/temperature (DT) of the wire

The label is slightly incorrect - it should say the maximum/minimum temperature of the wire/cable.The limiting factors can be insulation or conductors.Regardless of the method, it is important to understand the scope of the system's operation.This step should also include evaluating wire support equipment, such as joints and connectors.

Step 5: Operating environment/Determine ambient temperature

This step can be used in conjunction with step 4, but it includes an evaluation of the ambient operating temperature of the area.The inspection in this area should also cover nearby systems, equipment, and pipelines to determine if there are any heat sources that may affect the temperature of the wires.The results of this step should be applied to determine the current derating (such as AS50881 and EWIS)As described in the "LECTROMEC Derating Tool Tutorial".

Step 6: Voltage Drop Assessment

The isolation from the power bus to the powered device will affect the voltage seen by the final device.Smaller sized wires (such as 24) have a resistance of 2.5 ohms per 100 feet.

In this step, it is recommended to determine the routing separation distance in the system and determine the voltage drop.These suggestions can be found in AS50881.

Step 7: Add line gauges

According to the evaluation results, it may be necessary to increase the line gauge to meet the required voltage drop and current carrying requirements of the system.If a new wire gauge/circuit protection pairing is selected, return to step 2 and repeat the exercise.

This process may seem too complicated, but it is necessary to address the issue of the correct size of the wires and corresponding circuit breakers.Small wires may act as heat sources and/or reduce the functionality of connected devices.Excessive circuit protection may not be able to protect the wire interconnect system and may not respond in many fault situations.

Determine which option requires the widest range of operating environment conditions based on the choice between 2a and 2b; This may be a combination of the two.

The above flowchart is excerpted fromNASA Technical Memorandum 102179-1991.This chart provides a flowchart of design considerations for circuit protection, starting from determining current requirements and ending with system implementation. The following 7 steps will discuss the flowchart in more detail.






tag: 斷路器
主站蜘蛛池模板: 午夜毛片免费观看视频| 日韩精品一级a毛片| 欧美亚洲第一区| 亚洲欧美日韩伦中文| cos福利| 日韩中文字幕网| 华人在线视频| 苦瓜se影院在线视频网站| 欧美日韩亚洲国产一区二区三区| 草久久免费视频| 最新欧洲大片免费在线| 222av| 国产在线视频第一页| 亚洲第一免费视频| 最新的国产成人精品2022| 国产亚洲一区在线| 国产在线一区二区三区| 2021国产精品自产拍在线观看| 欧美日韩在线精品成人综合网| 91久久亚洲国产成人精品性色| 国产精品久久久久免费| 国产精品欧美亚洲韩国日本| 成人午夜黄色| a毛片免费在线观看| 国产精品日韩欧美一区二区三区 | 国拍在线精品视频免费观看| 欧美日韩在线免费| 中文字幕不卡免费视频| 99精品久久久久久久| 国产免费黄色大片| 日韩高清欧美精品亚洲| 99热这里都是精品| 91青青青国产在观免费影视| 成人国产精品久久久免费| 二区在线观看| 日韩亚洲国产激情在线观看| 国产一级高清免费观看| 99在线热播精品免费| 免费jizz在在线播放国产| 亚洲一区二区三区高清不卡| 日韩久草|